Tactics 101 043 – Air Assault: The Loading PlanBy Rick Baillergeon and John Sutherland | Tactics101|War College | Published: November 13, 2009 at 1:56 pmAIR ASSAULT THE LOADING PLAN
![]() Soldiers from Delta Company, 2nd Battalion, 506th Infantry Regiment, Task Force Currahee, load up in a helicopter to head back to base after completing an operation near Spera in south-west Khowst province, Afghanistan, Nov. 21. During the operation they searched for weapons as well as search for key Taliban leaders within the area.
“It is better to see and communicate the difficulties and dangers of an enterprise, and to endeavor to overcome them, than to be blind to everything but success till the moment of difficulty comes, and to despond.” The Duke of Wellington
LAST MONTH In our last article, we focused on the air movement plan. Our discussion was part science and part art. Along the way we provided sections on terminology, control measures and left you with some keys to success as they relate to air movement planning. In summary: It is during air movement that the Air Assault Task Force is most vulnerable and visible—it’s a sitting duck if caught. A well-executed air movement will achieve surprise and rapid victory. When planned and executed wrong, the ground forces may well end up fighting for their lives as it applied to air movement. THIS MONTH Our article this month will focus on the fourth sub-plan of the air assault—the loading plan. As with the other sub-plans, the Loading Plan is critical to the overall success of the Air Assault. You can relate the air assault load plan to packing your vehicle for a trip. In the case of the trip, you want to make sure you have everything you need (although you always forget something) you want to pack it safely so you do not break anything, and you want to pack it in an order so you can get to everything you need when you need it. In this article we will focus on packing the bird, packing it safely and packing it in an order that facilitates further operations. We will key on the various tasks and personnel that enable us to achieve this. Let’s get this class started! THE LOADING PLAN As with all air assault planning, the loading plan builds on the previous three plans: the ground tactical plan, the landing plan, and the air movement plan. The loading plan is specifically based on the air movement plan. The purpose of the loading plan is straight forward — guarantee that troops, equipment, and supplies are loaded on the right birds thus preserving unit integrity. A detailed load plan sets the conditions so the Air Assault Task Force arrives at the Landing Zone (LZ) ready to execute the ground tactical plan. The loading plan has several functions. These include establishing the priority of loads, a bump plan, and how troops and equipment are cross-loaded so that command and control, combat power, and weapons are distributed and thus won’t all be lost in a single aircraft or group of aircraft. Load planning covers the organization and operation of the pick-up zone (PZ), including load positions, markings, and communications. The load plan also addresses the mixing of internal and external loads and mixing aircraft types such as troop and heavy lift—each requires a different size LZ. We will discuss each of these in detail below. Loading plans are coordinated with the Air Mission Commander (AMC) or the Aviation Liaison Officer (ALO). Copies go to the ALO, command and control elements, the AMC, and the PZ control officer. Battalion or larger operations cover the movement of troops, supplies, and equipment to the PZ, designate unit-loading sites, and dictate timing for arrival, loading, and departing of aircraft. Detailed standing operating procedures (SOPs) reduce the length and detail required in written plans, but regardless, the loading phase demands command attention to ensure smooth execution. A well-planned loading operation is the first step to overall air assault success while a botched loading plan can derail the entire mission. Let’s address some key factors in The Loading Plan PZ SELECTION Identification of PZ’s is the first step of loading plan development. This makes sense since you we need a place to load before you can load. I believe that is the old cart before the horse analogy. Anyway, I digress! Primary and alternate PZs are identified at the same time with the goal being the location of areas that can accommodate the lift aircraft. PZ specifications such as degree of slope, wind speeds, and distance between aircraft are the planning factors for selection. These can be adjusted based on unit experience and level of training. Extraction under pressure should be considered as part of PZ selection. The PZs must account for the delivery of suppressive fires and provide security for extracted units and helicopters. Below is a quick checklist of considerations when selecting a PZ:
“The Science of PZ Selection”
“The Science of PZ Selection” PZ CONTROL OFFICER The Pickup Zone Control Officer (PZCO) organizes, controls, and coordinates operations in the selected PZs. The PZCO leads a control group that manages operations including air traffic control, subordinate unit movement, and coordinates support personnel that clear the PZ and provide security. Company commanders select their own PZCO when acting as part of battalion operations. The PZCO has many responsibilities. These include:
MOVEMENT TO THE PZ One piece of the load plan that gets overlooked somewhat is the actual movement of the Soldiers and equipment to the PZ. This movement should be planned in itself and be very detailed. It is much more complicated than simply telling a unit to get over to the PZ in 30 minutes so you can load some aircraft. If this is the mindset then the air assault has little potential for success. You must consider the following in the movement:
LOAD PLANNING
![]()
Determining what and how an aircraft is loaded is a mixture of science and art. In terms of science, there are obviously physical restrictions on what can be loaded on an aircraft. In the case of load planning, size clearly matters! Fortunately, much stubby pencil work has been done to determine what can be achieved. As we have seen in Afghanistan and other environments, altitude and weather can clearly alter any planning factors. In regards to the art of load planning there are several rules that should be followed if at all possible. These include:
INTERNAL OR EXTERNAL LOADING
![]() Chipnook in the air
One decision that must be made in regards to the loading of supplies or equipment is if it will be loaded internally or externally. If a bird is loaded internally that means the supplies and equipment are loaded inside the aircraft. The advantages of this are that internally loaded helicopters generally fly faster and are more maneuverable. The disadvantage is that it takes longer to load and unload the bird. If a helicopter is loaded externally it means that supplies and equipment are loaded outside the aircraft. This translates to slingloading. The advantages of this are that the supplies and equipment can be loaded and unloaded far quicker than an internal load. The disadvantages are that a slingloaded helicopter is slower and less maneuverable. Additionally, you obviously must possess the sling and rigging equipment and trained, qualified personnel. The caution “do not attempt this at home, these are trained professionals” is certainly the case in regards to slingloading. AIRCRAFT BUMP PLAN One of the things that must be worked out before loading is an aircraft bump plan. On the PZ, there must be a plan in place when aircraft inevitability go down or do not arrive for some reason. A bump priority ensures that the most essential personnel and equipment arrive at the LZ first to facilitate the ground tactical plan. The bump plan specifies which personnel and equipment should be bumped when aircraft go down or do not arrive. If all personnel within a load cannot be lifted, they must know who is to offload and in what sequence. This ensures that key personnel are not bumped. A bump plan is designated for aircraft in each serial or flight. This sequence is listed on the air movement table and ensures that key aircraft loads are not left in the PZ. When an aircraft cannot lift off and key personnel are on board, they offload and re-board another aircraft in accordance with the bump priority. If a bump plan is not developed the end result is chaos on the PZ and a poorly synchronized operation on the other end. AIRCRAFT BUMP-AND-STRAGGLER CONTROL Related to the bump plan is to ensure an aircraft bump and straggler control collection point is established on the PZ. A PZ is not a place for individual Soldiers or groups to be wandering around aimlessly. If Soldiers are bumped from an aircraft they must immediately be moved the collection point. It is here that they are accounted for, regrouped, and rescheduled for a later aircraft. SEQUENCE OF DEPARTURE The sequence of departure from PZs is based on the mission to be accomplished by each subordinate unit upon landing. Priorities are based on the sequence of arrival at LZs. Units are to depart in order based on en route time to the LZ. For example, if Alpha Company is to land first at H-hour, and Bravo Company is second at H+5, and Bravo Company 15 minutes farther away in flight time it may depart the PZ before Company A. COMMUNICATIONS ON THE PZ
![]()
It is critical that there is a well-established and executed communications plan on the PZ. As stated earlier, this is developed and enforced by the PZCO and his personnel. On the PZ, you want to have the most secure comms as possible. Additionally, you want the majority of the personnel involved in the operation operating under radio listening silence. The more personnel talking the more likely the operation can be compromised. It only takes a couple undisciplined Soldiers on a radio net to bring about a rain of artillery shells on a PZ. CONTINGENCY PLANS As we are all well-aware, things never go as planned. This is certainly the case with the Loading Plan and actions at the PZ. The good units will prepare for the what-ifs. What-ifs include actions that the enemy may conduct on you, weather issues, and maintenance issues. Be prepared!
PUTTING IT ALL TOGETHER
![]()
Above, we have placed a sketch of a PZ. Let’s review some of the terms and depict the locations of a typical PZ (if there is such an animal).
As you can see, there is a lot going on at or near the PZ. It takes disciplined Soldiers and quality leadership to make sure things go as smoothly as possible. SUMMARY It seems that the Load Plan and the PZ sometimes get neglected in air assault discussion. After all, the glamour is all about landing on the LZ and executing the ground tactical plan. However, as you have seen the Load Plan is vital to any potential mission success. You must get the right people and the right equipment on the right bird at the right time. That is a significant challenge and truly puts the pressure on the PZCO and his people. The PZCO must mix a little science with a little art and sometimes a little luck. When things go right it is a beautiful thing! Unfortunately, one little hiccup can have huge ramifications! NEXT MONTH
![]()
We will conclude our mini-series on air assault operations with a discussion on the final sub-plan – the staging plan. Within this discussion, we will focus on preparation and a dissection of the air mission brief which drives the entire operation. At the conclusion of the article we will provide a detailed review of our mini-series and a list of nuggets that will assist you in achieving success when you execute an air assault on your battlefield.
![]() The Coveted U.S. Army Air Assault Badge AIR ASSAULT!! Tags: 20th-21st century warfare, Scholarship
2 Responses to “Tactics 101 043 – Air Assault: The Loading Plan”Leave a Reply
|
|
What is Armchair General?Armchair General is the INTERACTIVE history magazine where YOU COMMAND and decide the course of action! Armchair General (ACG) and ACG online feature a unique, interactive editorial approach that invites the reader to decide the course of action in challenging historical scenarios, to step into the shoes of a battlefield commander. Leading historians and contributors lend integrity and credibility to this fresh presentation of historical and contemporary events. |
What We Write About
|
Our Other Magazines |
|
Weider History Network: Armchair General | HistoryNet | Achtung Panzer! Copyright © 2004-2011 Armchair General L.L.C., All rights reserved. Reproduction in whole or in part without permission is prohibited. |
||



Why would you make this kind of information, which, granted is already open source, even more accessible by our adversaries?
Anybody who actually needs this information (US soldiers, marines, airmen, sailors) are trained to do it. The only result of putting it out there in an easily-found, easily-digestible form is to bolster our enemies’ knowledge and abilities.
Our adversaries already know all of this and a lot more. If they didn’t, they wouldn’t be worthy adversaries. If anything, it’s Joe Public’s ignorance that hurts America the most.